KEKB ŠÖ˜A˜_•¶

1993 | 1994 | 1995 | 1996 | 1997 | 1998 | 1999 | 2000 | 2001 | 2002 | 2003 | 2004 | 2005 | 2006 | 2007 | 2008 | 2009 | 2010 |

1997

PAC97

High beam current experiments for the KEKB conducted at the TRISTAN Accumulation Ring
Y. Funakoshi and K. Akai
Proceedings of PAC97, p. 301 (1997).

Simulation of tail distributions due to random processes and beam-beam interaction in KEKB
E-S Kim and k. Hirata
Proceedings of PAC97, p. 384 (1997).

Dynamic aperture with multipoles of special magnets in the KEKB interaction region
H. Koiso et al.
Proceedings of PAC97, p. 1394(1997).

Development of high-power ARES cavities
T. Kageyama et al.
Proceedings of PAC97, p. 2902 (1997).

Fundamental mode characteristics of ARES cavity under beam environment
N. Akasaka et al.
Proceedings of PAC97, p. 2974 (1997).

Coupling cavity damper for the ARES
F. Naito et al.
Proceedings of PAC97, p. 2977 (1997).

HOM absorber for the ARES cavity
Y. Takeuchi et al.
Proceedings of PAC97, p. 2986 (1997).

HOM characteristics of the ARES cavity
T. Kobayashi et al.
Proceedings of PAC97, 3069 (1997).

Beam test of a superconducting damped cavity for KEKB
T. Furuya et al.
Proceedings of PAC97, p. 3087 (1997).

Development of highg power ARES cavities
T. Kagayama et al.
Proceedings of PAC97, p. 3087 (1997).

Strategy for developing fast bunch feeddback systems for KEKB
E. Kikutani and M. Tobiyama
Proceedings of PAC97, p. 2332 (1997).

Study of bunch by bunch feedback system in TRISTAN AR
M. Tobiyama and E. Kikutani
Proceedings of PAC97, p. 2335 (1997).

Status and development of supercomducting cavity for KEKB
S. Mitsunobu et al.
Proceedings of PAC97, p. 2908 (1997).

Magnet power supply system for KEK B-Factory
T. Kubo and M. Yoshida
Proceedings of PAC97, p. 3467(1997).

Beam test results on HOM absorber superconducting damped cavity for KEKB
T. Tajima et al.
Proceedings of PAC97, p. 3090 (1997).

Status of the KEKB project
S.I. Kurokawa
Proceedings of PAC97, p. 381 (1997).

Weak-strong simulation of beam-photoelectron instability in a positron storage ring
K. Ohmi
Proceedings of PAC97, p. 1667(1997).

Calibration of KEKB beam position monitors
K. Satoh and M. Tejima
Proceedings of PAC97, p. 2087 (1997).

KEKB Bunch feedback systems and related systems
E. Kikutani and M. Tobiyama
Proceedings of DIPAC97, p. 248 (1997).

Beam dynamics in KEKB B facotry
K. Oide
Proceedings of 14th ICFA Beam Dynamics Workshop, p. 73 (1997).

Issues on interaction regions of electron positron factory machines
H. Koiso and N. Toge
Proceedings of 14th ICFA Beam Dynamics Workshop, p. 95 (1997).

Review of multibunch instability at KEKB
K. Ohmi
Proceedings of 14th ICFA Beam Dynamics Workshop, p. 391 (1997).

Beam photoelectron instability at KEKB
K. Ohmi
Proceedings of 14th ICFA Beam Dynamics Workshop, p. 429 (1997).

KEKB and JLC, electron positorn collider projects in Japan
S. Kurokawa
Proceedings of 7th Asia Pacific Physics Conference (1997).


SAST97

B,tau, charm and phi factories
S. Kurokawa
Proceedings of 11th Symposium on Accelerator Technology and Science, p. 9 (1997).

Present status of high power CW klystrons
S. Isagawa et al.
Proceedings of 11th Symposium on Accelerator Technology and Science, p. 185 (1997).

Power supplies for superconducting magnets at KEKB-IR
T. Ozaki et al.
Proceedings of 11th Symposium on Accelerator Technology and Science, p. 383 (1997).

First beam test result of a prototype wiere scanner for the KEKB injector linac and BT lines
T. Suwada et al.
Proceedings of 11th Symposium on Accelerator Technology and Science, p. 423 (1997).

Numerical design of a beam-energy-spead monitor
T. Suwada
Proceedings of 11th Symposium on Accelerator Technology and Science, p. 4264 (1997).

Beam position monitor system for KEKB
M. Tejima et al.
Proceedings of 11th Symposium on Accelerator Technology and Science, p. 86 (1997).

Feedback experiments in TRISTAN-AR and the bunch by bunch feedback systems for KEKB
M. Tobiyama and E. Kikutani
Proceedings of International Workshop on Multibunch Instabilities in Future Electron and Positron Accelerators, p. 305 (1997).

Solenoid design to sweep photo-electron at KEKB
S. Hiramatsu and H. Fukuma
Proceedings of International Workshop on Multibunch Instabilities in Future Electron and Positron Accelerators, p. 301 (1997).

Status of the KEKB accelerator and the Belle detector
D.R. Marlow
Nucle. Phys. Proc Suppl 55A 294 (1997).

Status of KEKB and Belle
D. Marlow
AIP Conference Proceedings 424:161 (1997).

Design of turn-by-turn BPM in KEKB
T. Ieir et al.
Proceedings of 11th Symposium o Accelerator Technology and Science, p. 412 (1997).

Design of synchorotron radaition monitor for KEK B factory
T. Mitsuhashi et al.
Proceedings of 11th Symposium on Accelerator Technology and Science, p. 273 (1997).

Beam test of a direct rf feedback system for KEKB
K. Akai et al.
Proceedings of 11th Symposium on Accelerator Technology and Science, p. 179 (1997).

Beam-power damage of beam monitor components
K. Akai et al.
Proceedings of 11th Symposium on Accelerator Technology and Science, p. 252 (1997).

New screen monitor syetem for KEKB injector linac
T. Suwada et al.
Proceedings of 22nd Linear Accelerator Meeging, (1997).

Development of a bellows assembly with rf-shield for KEKB II: abrasion and pumpig down tests
Y. Suetsugu et al.
Proceedings of 11th Symposium on Accelerator Technology and Science, p. 362(1997).

Status of the KEKB accelerator control system development
S. Katoh et al.
Proceedings of 11th Symposium on Accelerator Technology and Science, p. 452 (1997).

Construction status of the KEKB injector linac
A. Enomoto and Electron/Positron injector linac group
Proceedings of the 22nd Linear Accelerator Meeting in Japan, p. 4 (1997).

Fabrication of the S-band accelerator guides for KEKB injector (II) (in Japanese)
Y. Igarashi et al.
Proceedings of the 22nd Linear Accelerator Meeting in Japan, p. 122 (1997).

Fabrication of the S-band accelerator guides for KEKB injector (III) - Highpower test - (in Japanese)
S. Yamaguchi et al.
Proceedings of the 22nd Linear Accelerator Meeting in Japan, p. 125 (1997).

Design and fabirication of the S-band high power dummy load and 3db directional coupler for KEKB injector (in Japanese)
Y. Igarashi et al.
Proceedings of the 22nd Linear Accelerator Meeting in Japan, p. 128 (1997).

Phase measurements to tune KEKEB 60-KW driver klystrons (in Japanese)
T. Matsumoto et al.
Proceedings of the 22nd Linear Accelerator Meeting in Japan, 134 (1997).

Phase variation of high power klystron at KEKB linac (in Japanese)
K. Nakao et al.
Proceedings of the 22nd Linear Accelerator Meeting in Japan, p. 137 (1997).

Device histories at the KEK injector-linac (in Japanese)
N. Kamikubota and K. Furukawa
Proceedings of the 22nd Linear Accelerator Meeting in Japan, p. 204 (1997).

Development of streak-camera system for the KEKB linac (in Japanese)
Y. Ogawa et al.
Proceedings of the 22nd Linear Accelerator Meeting in Japan, p. 323 (1997).

Beam position monitor of KEKB injection linac (in Japanese)
H. Kobayashi et al.
Proceedings of the 22nd Linear Accelerator Meeting in Japan, p. 326 (1997).

New screen monitor system for the KEKB injection linac
T. Suwada et al.
Proceedings of the 22nd Linear Accelerator Meeting in Japan, p. 329 (1997).


Top of page