KEK TOP >>Accl. Lab. >>Previous News
Last Updated: April 4, 16:20, 2011
Previous announcements from the Accelerator Laboratory will be posted to this website.
- Electrical power conservation
- Restoration of electric power
- Postponement of Accelerator Laboratory seminars and meetings
10:00 - KEKB and PS areas (including all buildings around the research buildings)
13:00 - High Intensity Light Source area (PF-AR、KEKB control and surrounding buildings) as well as PF (including Linac).
Yon-go-kan Bldg. | March 23(Wed.) 10:00 |
Ichi-go-kan Bldg. | March 23(Wed.) 14:00 |
Ni-go-kan Bldg. | March 23(Wed.) 14:00 |
Kenkyu-Honkan Bldg. | March 24(Thu.) 10:00 |
PF Main Bldg. | March 24(Thu.) 14:00 |
KEKB Control Bldg. | March 25(Fri.) 10:00 |
Electron-Positron Accelerator Experimental Preparation Bldg. (next to KEKB Control Bldg.) |
March 25(Fri.) 10:00 |
Electron-Positron Linac | March 25(Fri.) 14:00 |
Tsukuba Campus: Please return to regular working hours when electrical power is restored to your office.
However, as many facilities and pieces of equipment remain without electrical power, each group should determine the most effective way to work. Please make sure all necessary precautions have been taken to prevent fire or other accidents when electricity is restored. Following restoration, please conserve electricity to the utmost of your ability. (Excess power consumption can trigger unannounced, forced measures.)
Elevators are stopped for the time being.
In the event of a problem with facilities or equipment, unless it is an emergency, please contact each division head, or the Director of the Accelerator Laboratory (4138), rather than contacting the Facilities Division directly.
Tokai Campus: Announcements will be made separately.
Copyright(c) HIGH ENERGY ACCELERATOR RESEARCH ORGANIZATION, KEK
1-1 Oho, Tsukuba, Ibaraki 305-0801 Japan
mailto:web-acc@ml.post.kek.jp