日時: |
2005-10-05 13:30 - 14:30 |
場所: |
PF研究棟2階会議室 |
会議名: |
放射光セミナー「Present Status of INDUS-I and INDUS-II」 |
講演者: |
Dr. Vinod Sahni (CAT, Indore, India) |
講演言語: |
英語 |
URL: |
http://pfwww.kek.jp/pf-seminar/ |
アブストラクト: |
Present status of INDUS-I and INDUS-II is reported. INDUS-I is a 450 MeV synchrotron light source at CAT and has been operational from 1999. The construction of INDUS-II, a 2.5 GeV synchrotron light source at CAT, has been completed, and the commssioning of the machine has started. CAT has observed the beam circulate in the ring on August 27. |
|